Thread Content
On July 23, the commissioning ceremony for Fushun Petrochemical Company’s newly built 200,000 tons per year solution-process polyethylene plant was successfully held at the Ethylene Department. The construction of a new 200,000-ton/year solution-process polyethylene plant is an important part of the company’s project to upgrade its 800,000-ton/year ethylene plant and improve its energy efficiency. It plays a key role in the company’s efforts to achieve technological self-reliance and develop new forms of productive capacity tailored to local conditions. It also carries the mission of strengthening the high-end new materials industry and establishing core competitive advantages. This project is of great significance for the company to focus on technological innovation, accelerate transformation and upgrading, pursue high-quality development, and move forward toward the higher end of the \"refining, chemical processing, and high-value materials\" industry chain. The facility covers a total area of approximately 36,000 square meters. It utilizes China National Petroleum Corporation’s first independently developed polyethylene production process kit with an annual capacity of 200,000 tons. This process kit was developed through collaboration between Fushun Petrochemical Company and Daqing Petrochemical Engineering Co., Ltd., marking an important achievement in terms of independent innovation in the field of core polyethylene production technologies.
【Ten Years of Rapid Development in Chemical Engineering Equipment】China’s first safe hydrogen-based energy storage device was unveiled in Beijing from 2559 to 2025 https://bbs.hcbbs.com/thread-5697390-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Equipment】2560-2025: Filling the Gaps! “The \"high-pressure pure hydrogen pipeline steel pipe for hydrogen transport\" has been developed! https://bbs.hcbbs.com/thread-5697391-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Equipment】2561-2025: Successful Pilot Production of High-Purity Aramid Raw Material – Phenylenediamine by Jiangxi Fangyuan New Materials https://bbs.hcbbs.com/thread-5697403-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Processing Equipment】2025–2055: Paving the way for green ammonia to replace traditional fossil fuels; the world’s first refueling operation using green ammonia as marine fuel was successfully completed. https://bbs.hcbbs.com/thread-5697473-1-1.html (Source: Haichuan Chemical Industry Forum)
This post was last edited by Desert Fish on 2025-7-28 08:20: [Ten Years of Rapid Development in Chemical Equipment] The world’s largest integrated alkane production facility, 2568-2025, has been built and put into operation in Fujian. https://bbs.hcbbs.com/thread-5697547-1-1.html (Source: Haichuan Chemical Forum)
【Ten Years of Rapid Development in Chemical Equipment】World’s largest alkane integration production facility built and put into operation in Fujian from 2025 to 2568 https://bbs.hcbbs.com/thread-5697547-1-1.html (Source: Haichuan Chemical Forum)
【Ten Years of Rapid Development in Chemical Equipment】The world’s largest solid hydrogen storage project, 2570-2025, was successfully put into operation as part of the Daan integrated demonstration project for producing green hydrogen from wind and solar energy for ammonia synthesis. https://bbs.hcbbs.com/thread-5697592-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2025 to 2035, significant breakthroughs have been achieved in China’s ultra-low temperature core equipment; the country’s first 120-cubic-meter fixed ultra-low temperature storage tank was developed. https://bbs.hcbbs.com/thread-5697597-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Equipment】2572–2025: Hulunbuir Jinxin Chemical’s fixed-bed slag gasification furnace sets a world record for continuous operation! 3 Zemach slag gasification furnaces + 1 Shell furnace in operation for 300 days https://bbs.hcbbs.com/thread-5697643-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s largest and most comprehensive emergency response testing system was approved for use between 2025 and 2573. https://bbs.hcbbs.com/thread-5697666-1-1.html (Source: Haichuan Chemical Industry Forum)