【Haichuan Expands Horizons】Installation of Large Boiler Beam Slabs

2025-09-12View Original

Thread Content

The large plate beam is a large structural plate beam located at the top of the boiler frame, used to suspend and bear the main weight of the boiler itself (the heating surfaces) and to transfer forces to the boiler columns. At 9:37 on May 19, the large beam of Boiler No. 1 in the construction project of the 2×1000 MW peak-shaving coal-fired power plant operated by Huadian Gansu Company in Jinchang was officially lifted. Under the precise control of an 800-ton crawler crane, the large beam at axis K2 was raised smoothly and installed in place, marking a new phase in the project’s development and laying a solid foundation for the subsequent installation of the boiler’s heating surfaces as well as for the overall completion of the project. This project uses high-efficiency ultra-supercritical boilers designed and manufactured by Harbin Boiler Factory. The large beam to be lifted this time is located in section C; it has a length of 43.9 meters, a height of 3.9 meters, and a weight of 114 tons.
Reply #22025-09-12
On the morning of July 16, 2025, the first large steel beam for Boiler No. 6 in the Phase III project of the Dabie Mountain Power Plant carried out by the construction company was officially lifted, marking the full entry of the project into the peak phase of boiler steel structure installation.
Reply #32025-09-12
At 7:58 on September 8, 2025, the first large slab beam for Boiler No. 5 of the Chaozhou Million Project was officially lifted, marking the entry of the installation of the main structure of Boiler No. 5 into a critical phase and laying a solid foundation for the subsequent installation of the boiler’s heating surfaces. There are a total of 14 large beam sections for Boiler No. 5, among which C, D, E, and F feature an upper and lower stacked beam structure. The first large slab beam lifted this time weighed approximately 107 tons, was 42 meters long, 1.3 meters wide, and 3.9 meters high. The height at which it was lifted into place was 87.2 meters. A combination of a 160-ton tower crane and a 1,250-ton crawler crane was used for the lifting operation, and through careful planning and precise handling, the slab beam was successfully lifted and placed in position smoothly.
Reply #42025-09-12
【Ten Years of Rapid Development in Chemical Equipment】China Petrochemical’s first fully domestically produced Safety Instrumented System (SIS) was successfully tested and approved in Hangzhou from 2021 to 2025. https://bbs.hcbbs.com/thread-5700967-1-1.html (Source: Haichuan Chemical Forum)
Reply #52025-09-12
【History of Haichuan Chemical】Permanent shutdown of the facilities at Huayi Group’s Shanghai Nenghua Wujing plant https://bbs.hcbbs.com/thread-5701106-1-1.html (Source: Haichuan Chemical Forum)
Reply #62025-09-13
【Ten Years of Rapid Development in Chemical Equipment】2655-2025: Sinochem Shengao Chemical in China releases the high-end antioxidant precursor MIAK, filling a gap in the domestic market https://bbs.hcbbs.com/thread-5700673-1-1.html (Source: Haichuan Chemical Forum)
Reply #72025-09-13
【Ten Years of Rapid Development in Chemical Engineering Equipment】2668-2025: China’s first mobile energy storage power system was successfully applied on a drilling platform operated by Great Wall Drilling https://bbs.hcbbs.com/thread-5701137-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #82025-09-15
【Ten Years of Rapid Development in Chemical Engineering Equipment】Successful hydrogen production from gas field production water from 2680 to 2025; the application areas of Dongfu Research Institute’s seawater hydrogen production technology continue to expand. https://bbs.hcbbs.com/thread-5701249-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #92025-09-15
【Ten Years of Rapid Development in Chemical Equipment】From 2681 to 2025: China successfully installed 1.8 million tons per year of ethylene plant cracking gas compressors developed independently https://bbs.hcbbs.com/thread-5701251-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #102025-09-16
【Ten Years of Rapid Development in Chemical Engineering Equipment】New breakthroughs achieved in China’s low-temperature carbonization technology for coal from 2016 to 2025 https://bbs.hcbbs.com/thread-5700695-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #112025-09-16
【Ten Years of Rapid Development in Chemical Equipment】2683-2025: SHENGU’s First Low-Temperature Ethylene BOG Reciprocating Compressor Completes Test Runs under Ultra-Low Temperature Conditions https://bbs.hcbbs.com/thread-5701341-1-1.html (Source: Haichuan Chemical Industry Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.