As of November 5, at the construction site of Terminal No. 2 for crude oil at the Xianrendao Port area of Yingkou Port, whose total investment amounts to 934 million yuan, the terminal, auxiliary facilities, and underwater pipelines have all been completed, while the land-based pipelines and crude oil transmission lines are still under construction. By 2025, the Xianrendao Economic Development Zone in Yingkou will aim to achieve new breakthroughs in its comprehensive revitalization efforts over a three-year period. By leveraging project development as a driving force, it will continue to optimize its industrial structure, exhibiting a positive development trend of steady progress coupled with improved quality, thus delivering satisfactory results as the 14th Five-Year Plan comes to an end.
At the site of the No. 2 crude oil terminal project in the Xianren Island port area of Yingkou Port, the terminal building, auxiliary facilities, and underwater pipelines have been completed, while the land-based pipelines and crude oil transmission lines are under accelerated construction. With a total investment of 934 million yuan and a designed annual handling capacity of 16 million tons, this project is scheduled to be completed in its entirety by the end of 2026. Upon completion of this project, it will further enhance and improve the advantages of the port’s resources as well as its radiating influence, holding great significance for the formation and development of Yingkou’s port-related petrochemical industry belt, as well as for the construction of Liaoning’s coastal economic belt.
【HaiChuan Discussion】The client’s demands are getting higher and higher, while the prices kept being pushed lower. Can something done in these conditions pass the acceptance test? https://bbs.hcbbs.com/thread-5704576-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Equipment】The core equipment for China’s first 400,000 tons/year LAO production facility – the high-purity C4 and C6 product towers – was inspected and accepted in Dalian. https://bbs.hcbbs.com/thread-5704530-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first carbon dioxide + flywheel energy storage demonstration project was completed in Deyang, Sichuan, from 2003 to 2022. https://bbs.hcbbs.com/thread-5704593-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Equipment】The key technology project for \"converting coal into high-end carbon materials\" carried out by Zhaoqing Shunxin from 2005 to 2025 has passed the evaluation process. https://bbs.hcbbs.com/thread-5704595-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Great Development in Chemical Equipment】From 2806 to 2025: Dalian Institute of Chemical Physics’ new fixed-bed process for producing hydroquinone via phenol and hydrogen peroxide hydroxylation passes the scientific and technological achievement evaluation. https://bbs.hcbbs.com/thread-5704724-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Great Development in Chemical Equipment】From 2806 to 2025: Dalian Institute of Chemical Physics’ new fixed-bed process for producing hydroquinone via phenol and hydrogen peroxide hydroxylation passes the scientific and technological achievement evaluation. https://bbs.hcbbs.com/thread-5704724-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Equipment】2791-2025: Fuda Zijin Hydrogen Energy unveils China’s first 1,000-kilogram-class commercial ammonia decomposition hydrogen production and hydrogen refueling station https://bbs.hcbbs.com/thread-5704209-1-1.html (Source: Haichuan Chemical Industry Forum)