Thread Content
On November 7, good news came from the construction site of the dry quenching project at Xilaifeng Coking Plant of **Energy Group’s Coking Company**: the circulation fan for the first dry quenching furnace was successfully installed, laying the foundation for subsequent joint testing and commissioning of the dry quenching system. This marks the entry of the project construction into a critical phase. The centrifugal fan installed this time serves as the \"power hub\" and \"blood circulation pump\" of the dry quenching system; its installation accuracy directly determines the circulation rate of the cooling gas, the uniformity of heat transfer, and is also closely related to the dynamic stability of the system pressure. Facing the multiple challenges associated with this installation task, everyone took proactive measures by analyzing the technical details of each component based on the equipment diagrams. A comprehensive installation plan was developed, covering aspects such as task allocation, sequence of operations, quality control, and safety measures. Additionally, an innovative five-step construction method – assembly, positioning, calibration, connection, and fixation – was established to provide a clear technical roadmap for the installation process.
【Ten Years of Rapid Development in Chemical Engineering Equipment】2796-2025: Construction Management of Ethylene Process Piping Projects at Huanqiu Liujiàn’s Tarim Project Site – Completion of All Tasks https://bbs.hcbbs.com/thread-5704422-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Processing Equipment】2797-2025: Guangxi Petrochemical’s world’s first variable-frequency drive system enables hot standby switching for compressors in electrically driven ethylene production units. https://bbs.hcbbs.com/thread-5704443-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】2814-2020: Qingdao Institute of Energy became the world’s first institution to successfully commercialize a production process for 200,000 tons per year of second-generation biodiesel using liquid molecular catalysis technology. https://bbs.hcbbs.com/thread-5704915-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2018 to 2025, Donghua Company’s graphene-based anti-corrosion coatings produced via gas-phase synthesis were included in the list of innovations recommended by central state-owned enterprises. https://bbs.hcbbs.com/thread-5705057-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first 2×15 megawatt supercritical carbon dioxide-based waste heat power generation demonstration project was connected to the grid between 2015 and 2025. https://bbs.hcbbs.com/thread-5704984-1-1.html (Source: Haichuan Chemical Engineering Forum)
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2816 to 2025: The robot-based automatic loading machines developed by Changzhou Daojin have solved the problem of difficult loading. https://bbs.hcbbs.com/thread-5705014-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Processing Equipment】The largest domestic project of its kind for continuous polymerization on a scale of 5,000 tons per batch of para-aramid fibers was successfully put into operation between 2021 and 2025. https://bbs.hcbbs.com/thread-5704579-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2816 to 2025: The robot-based automatic loading machines developed by Changzhou Daojin have solved the problem of difficult loading. https://bbs.hcbbs.com/thread-5705014-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first carbon dioxide + flywheel energy storage demonstration project was completed in Deyang, Sichuan, from 2003 to 2022. https://bbs.hcbbs.com/thread-5704593-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first carbon dioxide + flywheel energy storage demonstration project was completed in Deyang, Sichuan, from 2003 to 2022. https://bbs.hcbbs.com/thread-5704593-1-1.html (Source: Haichuan Chemical Industry Forum)