On November 2, local time in Iraq, the OT3 crude oil processing unit at the West Qurna oil field, constructed by the West Qurna project under the Iraqi Engineering Command, was successfully put into operation, marking the full entry of the OT2&3 projects into the operational phase. This is another major milestone achieved by the project following the early commissioning of the OT2 unit. The project adopts an integrated management model that combines local and foreign personnel, and has established a hierarchical control system centered around the P6 plan. Through hierarchical management at the levels of \"master plan—rolling plan—specific plan—daily plan\", along with a dynamic mechanism of daily tracking and weekly analysis, efficient progress of the construction is ensured. The project department has established a regular coordination meeting system, holding daily briefings and weekly production coordination meetings to swiftly resolve issues related to site interfaces, resource allocation, and technical challenges, thereby ensuring the orderly progress of cross-functional and multi-regional operations. At the same time, through precise resource allocation and accelerated work measures, the timely commissioning of the two core units, OT2 and OT3, was ensured. The successful commissioning of the West Qurna OT3 facility has enabled the company to establish itself once again as a benchmark for high-quality and efficient engineering work in the Iraqi market. It has also helped to train a group of technical construction management professionals in Iraq who are familiar with international standards, thus making new contributions to the company’s strategic goals for sustainable development overseas.
【Ten Years of Rapid Development in Chemical Equipment】2823-2025: Zhejiang Xinhecheng becomes the third company in the world to master the technology for producing bio-based PPS products. https://bbs.hcbbs.com/thread-5705209-1-1.html (Source: Haichuan Chemical Industry Forum)
【Common Issues in Haichuan Pipeline Design】Proper consideration should be given to the space required for equipment maintenance and the operating space for valves. https://bbs.hcbbs.com/thread-5705460-1-1.html (Source: Haichuan Chemical Forum)
【Great Article Sharing】The Decade-long Gamble on \"Coal-to-Olefins\": What Have We Won, and What Have We Lost? https://bbs.hcbbs.com/thread-5705491-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】China’s largest \"carbon capture\" project: Successful trial injection of carbon dioxide in Yulin’s 4 million-ton capacity \"carbon capture\" project 28262025 https://bbs.hcbbs.com/thread-5705257-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2027 to 2025, the Three Gorges Group’s Ulanqab \"integration of power generation, transmission, consumption, and storage\" test base successfully produced liquid hydrogen. https://bbs.hcbbs.com/thread-5705274-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Processing Equipment】Delivery of the first modular submerged combustion vaporizer (SCV) unit in China that utilizes a floating storage and regasification unit (FSRU), 2828–2025 https://bbs.hcbbs.com/thread-5705393-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】China-made desalination modules for European methanol projects were officially delivered and shipped, 2029–2025 https://bbs.hcbbs.com/thread-5705395-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】Successful assembly of the DC converter transformer for the world’s first \"sea-land integrated\" flexible DC transmission project from 2025 to 2030 https://bbs.hcbbs.com/thread-5705493-1-1.html (Source: Haichuan Chemical Engineering Forum)