HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Discussion】Utilities - Civil Engineering - 20201003

2020-10-20View Original

Thread Content

During the pouring of mass concrete, when the length of the structure exceeds three times its thickness, it is advisable to adopt a pouring method that involves layering along inclined surfaces. Is this sentence correct? We welcome active participation in discussions; the system offers generous rewards for answering questions from VIP members! ! !
Reply #22020-10-21
Correct. Analysis: When the length of the structure exceeds three times its thickness, it is advisable to adopt a sloped layered pouring method. During construction, the vibration of the concrete should start from the lower end of the poured layer and move upward gradually to ensure the quality of the concrete work.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.