Thread Content
【HaiChuan Building Design Review】Compilation Post–Understand design review requirements and improve standardized design https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5721370 (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs)). Chemical accident tanks (also known as emergency accident tanks or accident buffer tanks) are key environmental protection facilities used by chemical enterprises to collect, store, and treat highly concentrated polluted wastewater generated in case of sudden environmental incidents. Its primary purpose is to prevent accident wastewater (such as leaked materials, fire-fighting cooling water, polluted rainwater, etc.) from being discharged directly into the environment or entering sewage treatment systems, thereby ensuring water quality and ecological stability. Is it a safety facility? It can be said that, basically without any controversy, it can certainly also be regarded as an environmental protection facility. The relevant standards all specify specific requirements for implementation. For example, according to the \"Code for Design of Water Supply and Drainage Pipelines in the Chemical Industry GB50873-2013\", \"3.1.8 The accident fire-fighting drainage pipelines in polluted areas such as production units and tank farms can be installed together with production wastewater pipelines and rainwater pipes (channels), or independently; however, they shall not pass through explosion-proof areas\" ; When crossing cannot be avoided, protective measures should be taken. ”Explanation of the provisions: 3.1.8 In an accident scenario, in addition to collecting fire-fighting wastewater and materials that leak during an accident, the accident pool and the collection pipeline system for accident wastewater must also take into account the collection of rainwater under such conditions. If the entry of rainwater is to be taken into account, special fire drainage pipes with larger diameters and longer lengths must be installed; otherwise they would remain idle during accidents, which is not economically reasonable ; For the same reason, the flow rate of wastewater generated is usually low, and the diameter of the drainage pipes is relatively small. When considering the inflow of rainwater in emergency situations, the diameter of the existing wastewater pipes is insufficient to meet the requirements, necessitating an increase in diameter manually, which is not economically viable. Therefore, in design, the production wastewater pipes and rainwater pipe (channel) systems are often used as collection systems for emergency drainage, which is currently a relatively economical and reasonable choice. Another example is the \"Code for Fire Protection Design of Petrochemical Enterprises GB50160-2008 (2018 Edition)\", where \"4.2.8A\" states that accident ponds and rainwater monitoring ponds should be located in the lower areas at the edge of the plant site, and can be arranged together with the sewage treatment facilities. The fire protection distance between the accident tank and open flames should not be less than 25 m, and the fire protection distance from elevated flares that may carry flammable liquids should not be less than 60 m. ”Explanation of the provision: 4.2.8A The accident tank is primarily used to collect contaminated fire-fighting water under fire conditions, polluted rainwater, and any combustible liquids that may leak. Accident water and rainwater generally flow by gravity through pipelines to the accident water tank and the rainwater monitoring tank; therefore, these tanks should be located at lower positions on the edge of the plant area. Accident water and rainwater that fails monitoring tests must be treated to meet standards before being discharged from the plant; locating the treatment facilities together with the sewage treatment plant can reduce pipeline lengths and save energy. Since a fire accident may be accompanied by a leak of flammable liquids, fire separation distances have been specified between the accident pool, open flames, and elevated flares that may carry flammable liquids. Since the accident pool remains empty for long periods of time, no fire separation distance is required from other facilities.
【Haichuan Teahouse】Next Stop--Paradise https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5723991 (Source: Haichuan Chemicals Forum (Hua Haichuan Liu hcbbs))
Amazing! ! Actual on-site photos explain why storage tanks need to have a weak roof structure! ! ! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5723994 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
[Haichuan’s Guide to Chemical Equipment] -- Liquid ring vacuum pump https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5724058 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Safety Management and Standardization of Special Equipment】Illustrated Quick Reference Guide to Major Hazards in Special Equipment! On-site inspection allows for direct comparison, enabling immediate identification of high-risk factors. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5724082 (Source: Haichuan Chemicals Forum (Hua Hai Chuan Liu hcbbs))
【Haichuan Chemical Valve Management】Series of Posts—Proper management of valves is the foundation for stable operation. Everyone is welcome to share and discuss! ! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5719309 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Is it an overzealous requirement to install combustible gas detectors outdoors without a rain cover? ? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5724304 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Forklifts Without License Plates; It does not comply with the provisions of Article 4.12.2 of the \"Rules for the Use and Management of Special Equipment\" TSG 08—2026: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5724341 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【In-depth Discussion on HaiChuan’s Modular Installation】Modular construction of the steel structure in pipeline gallery 3# of Nantong Blue Sea New Materials’ FDPE plant – achieving one-time transportation, one-time installation, and successful completion in just one attempt. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5723569 (Source: HaiChuan Chemicals Forum (Hua HaiChuan Liu hcbbs))
【Common Issues in Haichuan Pipeline Design】--Why are liquid seals required for some pipelines? ? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5724555 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】The 400,000 tons per year acrylonitrile plant at Zhenhai Refining & Chemical has been operating stably for one year, from 2017 to 2026. The independently developed S-ANT acrylonitrile technology package has been successfully industrialized. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5724666 (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))