What should be included in an LNG plant performance assessment report? Is only power consumption per unit of output sufficient?
Reply #22017-06-03
It depends on which of your metrics have a greater impact on costs
Reply #32017-06-03
It seems that apart from labor, other input-output performance factors also need to be taken into account under different loads.
Reply #42017-06-03
Lacking experience, the assessment report provided by the general contractor only includes information on power consumption and production volume over 72 hours; nothing else is listed. . . .
Reply #52017-06-03
General evaluations should consider the energy consumption per unit of output, as well as water, electricity usage, and the operating condition of the equipment.
Reply #62017-06-05
The key performance indicators vary depending on the device, and it is not possible to consider only energy consumption as a factor.
Reply #72017-06-06
Well, it seems I’ll have to put some thought into this

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.