HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Question No. 123】November 24, 2017

2017-11-24View Original

Thread Content

【Daily Question No. 123】November 24, 2017: According to the Rules for Periodic Inspection of Pressure Vessels, if the annual inspection of pressure relief valves reveals any of the following conditions, the user is required to replace them within a specified time frame and to take effective measures to ensure safety during that replacement period. () Multiple choice: A. The shrapnel has exceeded its specified shelf life ; B. The direction of installation of the shrapnel is incorrect ; C. Exceeding the calibrated blasting pressure during use without detonation ; D. Fragmentation device leakage. For management purposes, if you need to view content from a few days ago, please go to the summary post below. 2017 Q&A Summary Thread (updates have started) http://bbs.hcbbs.com/thread-1657793-1-1.html 2017 Daily Question Summary Thread (updates have started) http://bbs.hcbbs.com/thread-1657794-1-1.html 2016 Q&A Summary Thread (updates completed) http://bbs.hcbbs.com/thread-1597792-1-1.html

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.