HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

I have a question regarding the drainage groove

2021-10-06View Original

Thread Content

According to the regulatory requirements, liquid collection ponds and collection systems must be installed in the tank area and process area. Is the collection system here referring to the drainage ditches? If no guide channel is used, are there other ways to collect the leaked LNG?
Reply #22022-03-07
The collection tray, liquid delivery pipe, liquid guide channel, and collection tank together constitute the leak collection system. However, a new issue has arisen: the dimensions of the guide vane channels have not been clearly calculated or specified. If you have any insights on this, I hope we can exchange ideas

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.