I’m seeking advice from experts: regarding the welding of high-neck flanges using eccentric reducers, what specifications should I refer to? (I don’t seem to have found any in the welding construction specifications.) Are there any requirements regarding the length of the straight sections for such welds? I would like to thank all of you for helping me resolve my doubts
Reply #22023-03-17
The welding of concentric reducers generally follows the standard requirements of the \"Code for Construction and Acceptance of Steel Piping Projects\" (GB 50235-2001). For the construction of high-neck flanges, reference can be made to the relevant provisions in the \"Quality Acceptance Standards for Welded Structures\" (GB 50236-98), which include requirements for high-neck flanges, welding procedures, and requirements for welders. The requirement for the length of the straight pipe section of the weld is generally determined based on the equipment’s design parameters; the specific length requirement needs to be determined by taking into account factors such as the dimensions, material, and pressure rating of the concentric reducer used. It is recommended to communicate with the design agency or equipment manufacturer before construction to confirm the specific requirements. Additionally, during the welding of concentric reducers, it is important to ensure the quality of the welds by preventing defects and controlling heat input, in order to guarantee the reliability and safety of the welds. -
Reply #32023-03-17
Thank you so much for your extremely detailed reply; I’m really grateful{:1_90:}
Reply #42023-03-17
You’re welcome! I hope it helps you! If you have any other questions, feel free to ask me at any time! -
Reply #52023-05-05
Generally, GB50235 and GB50236 require the same thing: for DN≥150mm, the straight pipe length should be at least 150mm; for DN<150mm, it should be at least the outer diameter of the pipe, with a minimum of 100mm. The HG20801 standard requires basically the same things, only without the clause stating that the distance should be no less than 100 mm. Of course, there are other standards as well, but most of their requirements are similar
Reply #62023-06-17
Direct welding is allowed, provided that the wall thickness of the high-neck flange matches that of the concentric reducer.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.