The main pipeline of Bid 2 for the Minjiang-Guangdong branch line of the West-to-East Gas Transmission Line 3 (from Chaozhou to Valve Chamber No. 27) has been completed

2025-12-08View Original

Thread Content

On December 1, the main section of Bid 2 for the Min-Guang branch line of the West-East Gas Pipeline Project III (from Chaozhou to Valve Room No. 27), which is being constructed by Zhongyuan Construction Company under PetroChina Engineering Construction Corporation, was completed.   Located in Raoping County of Chaozhou City and Dapu County of Meizhou City in Guangdong Province, this project is a **key initiative for the interconnection of natural gas infrastructure. The section constructed by Zhongyuan Construction Engineering is 64.32 kilometers long, including 2 station valve rooms. During construction, the project team overcame various challenges such as the complex terrain in mountainous areas, heavy rainfall, and a complicated environment in the surrounding villages. They optimized the fully automatic welding equipment used inside the tunnel, and conducted trial welds outside the tunnel using steel pipes to create arch frames that mimicked the tunnel’s shape. By adjusting the welding parameters, they managed to maintain a first-pass welding success rate of over 98%, which laid a solid foundation for the successful completion of the project.
Reply #22025-12-08
【Ten Years of Rapid Development in Chemical Processing Equipment】The first prefabricated module for the plant’s process pipeline system in CNPC’s Blue Ocean New Materials project (2028–2025) has been successfully shipped. https://bbs.hcbbs.com/thread-5707283-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #32025-12-08
【HaiChuan Safety Discussion】Hidden Dangers Around Us – The protective covers of pumps in flammable and explosive areas are made of iron https://bbs.hcbbs.com/thread-5707641-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #42025-12-08
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Problems Specific to Factories in the North: Stools in employee rest rooms lack backs and are placed right next to heating units. https://bbs.hcbbs.com/thread-5707651-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #52025-12-08
【Ten Years of Rapid Development in Chemical Processing Equipment】The first prefabricated module for the plant’s process pipeline system in CNPC’s Blue Ocean New Materials project (2028–2025) has been successfully shipped. https://bbs.hcbbs.com/thread-5707283-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #62025-12-09
【Ten Years of Rapid Development in Chemical Equipment】The world’s first commercial project for producing hydrogen via water photolysis, 2884-2025, has been completed and put into operation in Panzhihua City. https://bbs.hcbbs.com/thread-5707404-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #72025-12-09
【Ten Years of Rapid Development in Chemical Equipment】From 2025 to 2035, Pingmei Shenma Hydrogen Chemistry Company successfully achieved the domestic substitution of spare parts for high-pressure coal slurry pumps used in gasification units. https://bbs.hcbbs.com/thread-5707406-1-1.html (Source: Huchuan Chemical Forum (Hua Hai Chuan Liu hcbbs))
Reply #82025-12-10
【Ten Years of Rapid Development in Chemical Equipment】From 2886 to 2025: China’s first industrial production project using its own technology for hexanitrobenzene via the butadiene process – Tianchen Qixiang New Materials’ 200,000-ton/year hexanitrobenzene production facility has reached full capacity. https://bbs.hcbbs.com/thread-5707419-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #92025-12-10
【Ten Years of Rapid Development in Chemical Engineering Equipment】2888-2025: Dongfang Electric’s floating wind power hydrogen production platform receives the world’s first approval certificate https://bbs.hcbbs.com/thread-5707552-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #102025-12-11
【Ten Years of Rapid Development in Chemical Engineering Equipment】For the first time in China, a full-scale venting test for 10-megapascal high-pressure hydrogen pipelines was successfully carried out from 2893 to 2025. https://bbs.hcbbs.com/thread-5707979-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #112025-12-11
【Ten Years of Rapid Development in Chemical Equipment】From 2887 to 2025: The world’s first project for producing anhydrous ethanol via synthetic gas biofermentation at a capacity of 50,000 tons per year successfully yielded high-quality anhydrous ethanol and biological proteins. https://bbs.hcbbs.com/thread-5707547-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.