***The first phase of the first large-scale liquefied natural gas project has been fully completed

2025-12-08View Original

Thread Content

The consortium formed by the American engineering company Fluor and the Japanese company JGC has officially handed over the second liquefaction train (Train 2) to the owners of the LNG Canada project. With the completion of this milestone, Phase 1 of ***’s first large-scale liquefied natural gas project has been fully finished. JGC stated that Train 2 was delivered on December 1, marking the successful completion of all aspects of the project construction. LNG Canada is a joint venture jointly invested in by Shell (40%), Malaysia’s Petronas (25%), PetroChina (15%), Mitsubishi (15%), and South Korea’s Kogas (5%). Located in Kitimat, British Columbia, the project takes advantage of the region’s abundant natural gas resources on the West Coast, ice-free ports throughout the year, and proximity to Asian markets, making it considered an important starting point for developing LNG export capabilities in this area. The construction scope of the first phase is very extensive, including infrastructure such as natural gas reception and liquefaction facilities, a marine terminal capable of accommodating LNG ships, a tugboat dock, loading pipelines, production and processing units, storage tanks, a railway operation area, a wastewater treatment system, and a flare stack area. The entire plant is designed with an annual production capacity of around 14 million tons of LNG, and it is the first large-scale LNG plant of its kind to be built and put into operation in ***. With the completion of Phase 1, JGC and Fluor have begun working on the FEED updates for Phase 2 expansion. According to the plan, the second phase of the project will increase the factory’s annual production capacity from 14 million tons to 28 million tons. ***The federal government has also listed Phase 2 as one of the key projects to be accelerated. In addition, LNG Canada has also applied to the regulators to increase the current annual export quota by 6.4%. In terms of production, the project is also progressing smoothly. The first liquefaction line came online on June 22, 2025, while the second liquefaction line began production in November and was officially handed over on December 1. This means that both production lines at LNG Canada are now in operation, and the first phase of the project has been fully completed. Copy and search Copy and search
Reply #22025-12-08
【Ten Years of Rapid Development in Chemical Equipment】The coal-based α-olefin-based technology for producing medium-low viscosity mPAO, independently developed by Guoneng Group, was successfully put into operation for the first time: https://bbs.hcbbs.com/thread-5707383-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #32025-12-09
[Haichuan Chemical Technology Documents] 39 requirements for the layout of common equipment in chemical plants – worth saving! https://bbs.hcbbs.com/thread-5707686-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #42025-12-09
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to participate in the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #52025-12-09
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first commercial project for producing hydrogen through water photolysis, 2884-2025, has been completed and put into operation in Panzhihua City. https://bbs.hcbbs.com/thread-5707404-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #62025-12-10
【Ten Years of Rapid Development in Chemical Equipment】From 2886 to 2025: China’s first industrial production project using its own technology for adiponitrile via the butadiene process – Tianchen Qixiang New Materials’ 200,000-ton/year adiponitrile production facility has reached full capacity. https://bbs.hcbbs.com/thread-5707419-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #72025-12-10
【Ten Years of Rapid Development in Chemical Equipment】From 2887 to 2025: The world’s first project for producing anhydrous ethanol via synthetic gas biofermentation at a capacity of 50,000 tons per year successfully yielded high-quality anhydrous ethanol and biological proteins. https://bbs.hcbbs.com/thread-5707547-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #82025-12-10
【Ten Years of Rapid Development in Chemical Engineering Equipment】2888-2025: Dongfang Electric’s floating wind power hydrogen production platform receives the world’s first approval certificate https://bbs.hcbbs.com/thread-5707552-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92025-12-11
【Ten Years of Rapid Development in Chemical Engineering Equipment】For the first time in China, a full-scale venting test for 10-megapascal high-pressure hydrogen pipelines was successfully carried out from 2023 to 2025. https://bbs.hcbbs.com/thread-5707979-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #102025-12-11
【Ten Years of Rapid Development in Chemical Equipment】From 2887 to 2025: The world’s first project for producing anhydrous ethanol via synthetic gas biofermentation at a capacity of 50,000 tons per year successfully yielded high-quality anhydrous ethanol and biological proteins. https://bbs.hcbbs.com/thread-5707547-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #112025-12-12
【Ten Years of Rapid Development in Chemical Equipment】The “second-generation high-efficiency, low-energy urea synthesis process technology” with completely independent intellectual property rights, ranging from 2890 to 2025, has reached an internationally leading level in terms of overall technical performance. https://bbs.hcbbs.com/thread-5707669-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.