We are a thermal power plant, and for the 50-megawatt turbines, we conduct overspeed tests ourselves at our plant after each major overhaul. Recently, we have been carrying out the acceptance inspection for meeting safety standard requirements in our power plant. One evaluation company stated that we do not possess the qualifications for conducting turbine overspeed tests. Question: Are special qualifications required to conduct overspeed tests on steam turbines? What qualifications are required? Which department is responsible for issuing this qualification certificate?
I really don’t know; I’ll just wait for the expert’s reply to learn*
This is the first time I’ve heard of it; I thought I could just do it myself. I’ll wait for someone who knows the answer to explain it to me
We were done by Xinjinhua Machinery.
Turbine manufacturers certainly have the qualifications for overspeed tests
A set of overspeed test benches costs over 30 million; they are imported – can you afford them? ? ?
We do it all by ourselves; the control system includes something for conducting speed tests.
Equipment undergoes overspeed tests before leaving the factory, and no such tests are needed once it arrives at the user’s location.
The turbines used in the chemical industry are all tested by our own factory; power plants should also be able to conduct their own tests. You can send over the approval forms for us to take a look at