HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Vehicle commissioning and load testing plan

2018-03-14View Original

Thread Content

We recently installed a 100T electric crane on the project, and I would like to ask who should be responsible for the calibration and load-testing of the crane – the manufacturer? Construction contractor? Is it still operated by the owner? Another question: What documents are generally required and what procedures need to be followed to obtain a usage license for such lifting equipment?
Reply #22018-03-14
You can check Baidu for 【Vehicle Testing Plan】
Reply #32018-03-15
Unless otherwise stipulated in the contract, it is generally the manufacturer who is responsible for the commissioning and testing procedures. The installation must be registered with the local authorities; complete factory documentation as well as the qualifications of the installation company are required. Only after it has been tested and approved by a qualified local agency can a usage permit be issued.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.