HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

reciprocating compressor

2020-01-31View Original

Thread Content

Is it necessary to start the machine for running-in after replacing the new packing?
Reply #22020-01-31
I saw you posted before that the guide ring is worn eccentrically? It is best to observe the temperature and air leakage during running-in.
Reply #32020-01-31
Start up and run personal opinions. He's just grinding it out. Pay more attention to body temperature measurement and air leakage inspections
Reply #42020-01-31
Generally, it will run without load and check the stuffing box temperature.
Reply #52020-01-31
If running-in is required, just run it without load. The running-in situation can be inferred by detecting the temperature of the pipeline to the liquid collecting tank.
Reply #62020-02-01
You have to wear a mask :P:P:P
Reply #72020-02-02
At what point will the running-in be considered complete?
Reply #82020-02-02
Our compressor replacement packing does not break in

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.