Is it allowed to operate two mechanisms simultaneously during crane lifting?

2021-08-10View Original

Thread Content

A couple of days ago, during the maintenance of a bridge crane, it was found that the coupling between the motor and the reducer, as well as the shafts, were severely worn. The cover of the reducer was also cracked; it is likely that the swinging of the load during lifting caused this severe wear, especially since operating all three mechanisms at the same time is strictly prohibited by regulations. In fact, this situation may also occur when operating two mechanisms simultaneously. Is it allowed to operate two mechanisms simultaneously during crane lifting?
Reply #22021-08-10
Overhead cranes, gantry cranes, and crawler cranes are all acceptable; they must be capable of vertical takeoff/landing plus lateral movement.
Reply #32021-08-11
Sure, hook lifting and lowering plus movement
Reply #42021-08-11
This is how steel mills transport molten iron.
Reply #52021-08-11
The crane in the workshop is permitted for use, but overloading is not allowed

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.