HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

steam turbine

2021-08-19View Original

Thread Content

Take away the guide vane holding ring and the taper pin in the outer cylinder after assembly. What does this sentence mean? Where is the taper pin specifically located?
Reply #22021-08-19
I haven't installed it yet, I just read the information and want to know more about it.
Reply #32021-08-22
There is a pin in the guide vane holding ring in the upper and lower halves. After the installation and positioning of the holding ring is completed, the nut is spot welded and the pin is loosened and the pin is removed.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.