If a economizer is added behind the waste heat boiler

2017-05-25View Original

Thread Content

If a economizer is added after the waste heat boiler to recover 1 MW of heat from the flue gas, will the boiler be able to produce an additional 1 MW of evaporation, resulting in an evaporation rate of 1.5 t/h?
Reply #22017-05-25
It’s theoretically possible! It cannot be actually achieved
Reply #32017-06-01
It can be achieved without taking into account energy consumption and various heat losses
Reply #42017-06-01
The heating surfaces of the boiler economizer cannot be reused as evaporation heating surfaces, so this goal cannot be achieved.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.