If the external drawings come with modification notices, is it still necessary to make the changes on the original blueprints as well?

2017-07-09View Original

Thread Content

For the three types of external drawings that come with modification notices, is it still necessary to make the changes on the original blueprints as well?
Reply #22017-07-09
It needs to be modified in the diagram, but these days upgraded drawings are generally used directly
Reply #32017-07-10
If the modification order is signed and stamped, there is no need to change the blueprint; just keep the modification order together with the blueprint.
Reply #42017-07-10
The 4th floor is the correct choice; if it’s a significant modification, it’s best to affix the pressure vessel design stamp.
Reply #52017-07-10
Is modifying the design the responsibility of the design agency? Does the manufacturing unit have the right to make changes?
Reply #62017-07-10
It is necessary to determine whether the notice of drawing modification was issued by the design unit or the manufacturing unit; if it was the design unit that issued it, the changes should be made on the blueprints. If it is proposed by the manufacturing unit, clear markings must be made on the as-built drawings in accordance with the requirements specified in the written approval document from the design unit; such markings shall include the signature of the person who made the changes along with the date of the change.
Reply #72017-07-10
As long as a license for the design and manufacture of pressure vessels is obtained, there must be a quality assurance manual (or quality manual), along with procedural control documents regarding changes to the design documents. The modification procedures may vary among different units; just follow the requirements of the respective control procedures.
Reply #82017-07-10
As long as a license for the design and manufacture of pressure vessels is obtained, there must be a quality assurance manual.
Reply #92017-07-10
These are the regulations for preparing as-built drawings; the \"Solid Content Regulations\" specify the details.
Reply #102017-07-11
Of course it needs to be modified, and all the drawings must be altered; furthermore, the modified areas should bear the signature of the technical staff along with the date of modification. Otherwise, oversights are likely to occur during on-site production; it’s impossible to expect workers to find the design change orders and check the drawings every time they work!

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.