2017-08-16View Original

Thread Content

After upgrading to version SW6-3.1 and conducting calculations, it was found that some of the foundation bolts for the tower were much larger than what had been calculated earlier. In other words, when using SW6-3.1 to check the foundation bolts of the existing tower, all of them were found to be Unqualified This is strange, as NB/T47041-2014 has not yet been updated – so why is there such a significant change in the calculation results using SW6? What is the reason?
Reply #22017-08-16
How could this happen? I’ll give it a try too.
Reply #32017-08-17
It has been upgraded! In the first edition, the eccentric bending moment is off by two orders of magnitude; please check
Reply #42017-08-18
There was an issue with the calculation of eccentric bending moment in the original version. I asked the equipment control center, and they have an updated version of the software available on their website; simply download and install it again
Reply #52017-08-19
The bug has been fixed; the new version takes precedence

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.