Radiographic inspection ratio for the butt welds between the flanges and shell sections of heat exchanger equipment

2018-11-01View Original

Thread Content

The heat exchanger shell is made of seamless steel pipes. On the general layout, the weld joint factor for types A and B is set at 0.85. Should the butt welds between the equipment flanges and the connecting pipes in the shell be inspected using 100% RT or 20% RT? Which one is everyone following?
Reply #22018-11-01
In our company, 0.85 corresponds to 20%, while 1.0 corresponds to 100%. For specific details, refer to GB150 P13 4. 5.2 The welding joint coefficients are described in great detail
Reply #32018-11-01
In our company, 0.85 corresponds to 20%, while 1.0 corresponds to 100%. For specific details, refer to GB150 P13 4. 5.2 The welding joint coefficients are described in great detail
Reply #42018-11-01
Under normal circumstances, except in cases where substances such as water and air are non-toxic and non-explosive, and where strict requirements regarding leakage sealing are not necessary, a 20% inspection rate can be applied for Type B seams, with Grade III considered acceptable; However, for special equipment (other than air tanks, water tanks, collectors, etc.), a 100% rate is still recommended, although the acceptance criteria for Grade II require a higher rating ; It doesn’t have many episodes either.
Reply #52018-11-01
No longitudinal welds; Category A can be crossed out and not included. For Class B welds, circumferential welds generally do not play a controlling role. However, the pipes commonly used are usually quite thin, and there isn’t much difference between 100% and 20%. We have all set it to 100%, and the coefficient for Class B welds should be filled in as 1.
Reply #62018-11-01
Is the butt weld between the equipment flange and the shell section classified as 47023? I believe that standard requires 100% inspection for such welds
Reply #72018-11-01
Are there any other additional conditions under which 100% testing is required?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.