HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Is the setting scheme for the silo ear seat foundation bolts feasible?

2019-02-12View Original

Thread Content

In one of the company’s projects, there is a silo, with three weighing modules installed beneath its base. However, this weighing modulus is secured to the ring seat using only two M8 bolts; clearly, this silo is effectively unreinforced by any bolts. After consideration, we want to drill 6 more M30 bolt holes in the ring seat to install M24 foot bolts for securing the silo. During the installation of the silo, once it is in place, loosen the foot bolt nuts to an appropriate degree to ensure the proper functioning of the weighing module. See the attached diagram for details. Thank you all for discussing device security. I’m not sure if this plan is feasible.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.