On the weld procedure qualification for tube sheet welding

2019-05-05View Original

Thread Content

We have a product for which the drawings specify that the tube and plate should first be joined by strength expansion and then welded. In accordance with these requirements, we conducted a process evaluation for joining them first by expansion and then by welding. However, the inspection team requested that we also carry out an evaluation for joining them first by welding and then by expansion. Is such a practice acceptable?
Reply #22019-05-05
It seems we should determine what kind of process to use and conduct a process evaluation for it
Reply #32019-05-06
Personally, I don’t think it’s necessary. As long as it meets the requirements of the drawings, you can ask the quality inspector for the reason behind such a requirement
Reply #42019-05-06
Make the assessment in accordance with the requirements of the drawings; it is sufficient as long as it matches the drawings. I wonder what the basis for the inspection is
Reply #52019-05-06
This post was last edited by wanlirn on 2019-5-6 at 12:19. When giving lectures on welding evaluation standards, I wrote in my notes that test pieces subjected to expansion before welding must be identical to the welded components; in other words, they serve as replicas. This means that the thickness of the test piece plate should be the same as that of the tube sheet, and the materials should also be identical, along with the expansion length, etc. Everything else can follow the requirements specified in the welding evaluation guidelines. . . . I haven’t heard that two are going to be made
Reply #62019-05-09
When that happens, you can only laugh; some inspection officers simply don’t make any sense.
Reply #72019-05-09
Thank you! Later, the attitude of the inspection team changed, and they admitted that it was sufficient to follow the requirements specified in the drawings
Reply #82019-05-09
Thank you! Later, the attitude of the inspection team changed, and they admitted that it was sufficient to follow the requirements specified in the drawings

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.