HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Understanding of the standards for welding procedure qualification

2021-07-25View Original

Thread Content

1. It is the understanding that one welding procedure specification can be developed based on multiple weld qualification reports. Is it possible to use different standards? For example, can two weld qualification reports based on the standards NB/T 47014 and YS/T 0452 be used together to create one welding procedure specification? 2. The standard states in the impact test section: “When an impact test is required.” How should this be understood? Is it required when there are specifications in the design drawings? Are there any requirements for the pipes?
Reply #22021-07-25
One work instruction can be used for several process evaluations. Impact testing is determined by the material.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.