Hello everyone, I would like to ask you about some compliance issues related to special equipment in the chemical industry. Pressure vessels, pressure pipelines, safety accessories, etc., are classified as special equipment. In China, an licensing system is employed for their administrative management. The equipment is a skid-mounted unit that contains the aforementioned components. I’m facing two problems right now. 1. The equipment has already been manufactured abroad and is about to be imported, but pressure vessels and similar components do not have domestic SELO certification. Foreign equipment is certified according to the European CE-PED standard. For customs clearance as well as on-site installation and commissioning of the project, it’s inevitable to work with the local special inspection agency. What preparations do I need to make in advance? Foreign products are certified under PED; is there any mutual recognition with domestic standards? Is it enough to submit a compliance statement and a comparison table to pass? Specifically, are there any official documents in China that provide instructions on this matter? Since the equipment has already been manufactured abroad, it’s too late to change the pressure vessel supplier now. Thank you! Does anyone have any good suggestions for this? 2. If such equipment is to be assembled into skids in the domestic market and then sold to local customers. What kind of production qualifications are required to apply to the Special Equipment Licensing Office? The components of the skid-mounted unit, including pressure vessels, pipes, instruments, etc., are sourced from external suppliers; only integration (assembly) and testing are carried out in its own factory. Is it sufficient to apply for the manufacturing of pressure pipeline components – component assembly devices? Assume that the assembly relationships are threaded connections and flange connections. Is a design qualification also required for the overall skid-mounted drawing? Thank you!
For the production process, it is necessary to contact the Provincial Technical Supervision Bureau where your company is located in order to arrange for supervision and inspection; for those cases without such inspection, it is required to contact the Provincial Technical Supervision Bureau after the equipment arrives to arrange for an inspection. For specific operations, the department should contact the Provincial Bureau of Technical Supervision or the Provincial Special Inspection Institute directly.
Thank you for the reply. The equipment is manufactured abroad, and now people in China can’t go there either. We can only do these things after the equipment arrives at the customs. May I ask what is the full name of the Provincial Bureau of Technical Supervision? Once the goods arrive at Tianjin Port, is it necessary to turn to the Tianjin Technical Supervision Bureau or the Special Inspection Institute? Is it possible to carry out operations across different regions? For example, could I invite an inspection agency from Shanghai to go to Tianjin Port to handle these tasks? Thank you very much
For specific details, please contact the market supervision bureau (formerly the technical supervision bureau) where the equipment’s owner is located. It’s not the market supervision bureau at the port.
Contact them in advance now to avoid the hassle of going through procedures later
Imported products also require domestic special inspections, and similar to ASME requirements apply to domestic exports. Personally, I think this is a barrier meant to restrict imports from abroad and protect domestic industries in the same field.
This issue must be consulted with the specific **special equipment supervision agency** in charge!
Yes, the information is in patches. One must ask the authorities.
A manufacturing license system is implemented for pressure-type special equipment used abroad, and it is administered by the State Administration for Market Regulation. . .
Our unit is in contact with the provincial bureau. For details, refer to clause 6.4 on page 58 of TSG 21-2016. An inspection application should be submitted to the inspection agency at the place of use or the port of entry (if the place of use is unknown)