Operation, maintenance, and troubleshooting methods for reaction vessels

2022-02-13View Original

Thread Content

I. Pre-startup inspections and preparatory work 1. The reactor vessel itself is clean, and all accessories are complete and in good condition. The pressure gauge, vacuum gauge, temperature gauge, safety valve, valves, and drain valve on the boiler should be sensitive and accurate, with regular calibration markings. Devices for safety protection, ventilation, explosion prevention, etc., are in good condition and reliable. 2. The reducer and oil levels in all sections are normal. 3. The packing seal of the stirring shaft is properly compressed, with no leaks. 4. First, turn the mixing shaft by hand (or in pulses) to check its ease of operation, and pay attention to whether the mixer collides with the thermometer sleeve. 5. Check whether the inside of the pot is clean and whether there is any chipping of the ceramic coating (applicable only to glass-lined reactors). II. Startup and Operation 1 After starting the motor, the following should be checked: Verify that the motor rotates in a clockwise direction; reverse rotation of the mixer is strictly prohibited (only allowed during initial installation and after troubleshooting by disconnecting the wires). After starting with no load, check whether there are any abnormal noises from the rotating parts. Is the current value within the rated range, and are there any abnormal noises from the motor? 2. Check for leaks at all sealing points during operation. 3. Glass-lined reaction vessels must be protected against sudden temperature changes; the cold shock should be less than 110°C, and the heat shock should be less than 120°C. 4. When there is a blockage in the discharge opening at the bottom of the glass-lined reactor, it can be cleared gently using a non-metallic rod; the use of metal tools for removal is prohibited. 5. The pressure and temperature inside the pot must be strictly controlled to prevent overheating and overpressure. III. Turn off the power supply before parking, and check that the valves are in the correct position. IV. Maintenance: 1. Check that all components of the transmission system and sealing devices are not loose. 2. Check for any abnormal noises during operation. 3. Check the lubrication areas and add lubricant on time. 4. Check the sealing condition of the stuffing box and the operation status of the cooling system (including whether the cooling water flows smoothly and whether the outlet water temperature meets the specified requirements). 5. Check whether all working instruments and accessories are functioning properly. 6. When there is pressure inside the tank, it is strictly prohibited to tighten any pressure-bearing components while pressure is present. V. Handling of Common Faults
Reply #22022-02-13
Welcome, welcome:handshake

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.