HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Do the welding materials used for steel structures need to be sent for testing?

2022-03-13View Original

Thread Content

I haven’t sent samples to the laboratory before; this time, the client wants them to be tested in accordance with the requirements of GB50205-2020. I’d like to ask everyone for their understanding of this standard. Thank you
Reply #22022-03-13
Isn’t the specification written clearly enough?
Reply #32022-03-15
What does “send for inspection” mean? Professional technicians should avoid using such vague terms; standard procedures require re-inspection.
Reply #42022-04-22
I’ve already listed them all; if the manufacturing process is uncertain, I’ll discuss it with the designers. If it meets the requirements, then another inspection will be carried out. Why keep worrying? The people involved in the production process know best

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.