HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Issues with the container at the time of manufacture

2021-08-09View Original

Thread Content

There is a pressure vessel that has been manufactured many years ago; it couldn’t be delivered due to the suspension of the project. Many standards have since been updated. Now a customer is interested in purchasing it – is it possible to sell it, and what procedures are required?
Reply #22021-08-09
You should consult the local authorities responsible for supervising special equipment
Reply #32021-08-09
It can be sold, but it’s necessary to check with the local inspection agency to find out what procedures are required
Reply #42021-08-09
Were there proper completion procedures at that time?
Reply #52021-08-09
After inspection, it can be sold! For uninspected items, follow the new standards!
Reply #62021-08-13
If a inspection certificate has not been issued and one needs to be obtained now, then this equipment must meet the current standards and regulatory requirements. If a supervision and inspection certificate has already been issued, it is the same as the existing old equipment.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.