How can two storage tanks connected vertically and horizontally obtain inspection certificates?

2022-06-09View Original

Thread Content

The upper and lower storage tanks are connected together by pipelines; how should inspection be carried out – as if it were one piece of equipment, or as two separate pieces of equipment? Are there any regulations or standards in this regard that specify whether registration will be affected if supervision and inspection have been carried out?
Reply #22022-06-09
Each storage tank has a separate “ID card”; how can you register them as “one”? The manufacturer might not be the same either, right? It’s better to keep them separate for easier management. Sometimes, going through the trouble is the way to save trouble.
Reply #32022-06-09
If the two are connected together, the key is that the design drawings show them as two units combined
Reply #42022-06-09
Are these two devices connected directly? Flange mouth to flange buckle? It wasn’t taken over. How many are there on the labels of the two tanks? How many pieces of information are there?
Reply #52022-06-10
He hasn’t reached the stage where an ID card is required; this depends on how the design documents are formulated. If it is designed as a single pressure vessel, then it will be subject to inspection as one unit, while if there are two sets of design documents, it will be subject to inspection as two separate units. Anyway, the price is the same in any case.
Reply #62022-06-10
The number on the nameplate – the “ID card”!
Reply #72022-06-10
Both the storage tanks and the connected pipelines require inspection; check the documents issued by the General Administration of Quality Supervision, Inspection and Quarantine (website).
Reply #82022-06-10
According to the equipment tag number, AB stations are counted as two
Reply #92022-06-10
It depends on the construction drawings; when they are together, it’s just one drawing number, which is used as a reference

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.