HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Is the airtightness test of the filtration separator performed after the level gauge is installed on the equipment?

2023-12-27View Original

Thread Content

During the airtightness test of the filter separator, is the level gauge installed on the equipment before conducting the airtightness test? Still, during the airtightness test, the level gauge cannot be installed. The level gauge in place is damaged.
Reply #22023-12-27
The airtightness test of the filtration separator is usually carried out before the level gauge is installed, to prevent the level gauge from being damaged by the high pressure during the airtightness test. .

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.