The commissioning ceremony for the succinic anhydride reactor of Guangdong Hebiao Energy Technology Co., Ltd.’s 100,000 tons per year succinic anhydride production facility, which was undertaken by Bohua Engineering, will be held at Zhanghua Machinery. This meeting marks an important step forward in the manufacturing of the patented equipment for the 2 sets of 50,000-ton maleic anhydride reactors under this project. The meeting discussed the project’s start-up plan, confirmed the schedule for providing design drawings, clarified the special technical requirements during the manufacturing process, and reviewed the ordering status of key materials such as tube sheets, heat exchange tubes, and cylinders. The meeting established the equipment manufacturing plan and key inspection milestones, laying a solid foundation for the smooth progress of the project. Bohua Engineering and its partners also had in-depth discussions on specific issues related to subsequent work. The meeting discussed the project’s start-up plan, confirmed the schedule for providing design drawings, clarified the special technical requirements during the manufacturing process, and reviewed the ordering status of key materials such as tube sheets, heat exchange tubes, and cylinders. The meeting established the equipment manufacturing plan and key inspection milestones, laying a solid foundation for the smooth progress of the project. Bohua Engineering and its partners also had in-depth discussions on specific issues related to subsequent work.
Which design institute is responsible for the Bohua Project? Is it that design institute in Tianjin Port whose Class A design qualification was revoked?
The manufacturing of petrochemical equipment is advancing again – great job!
“Guangdong Hebiao Energy Technology Co., Ltd.: If steam can be purchased externally, this system is acceptable; otherwise, its performance will not be very good