I. Procurement and Acceptance System for Special Equipment 1. The procurement of special equipment is initiated by the enterprise’s equipment management department, which submits a purchase plan that must be approved by the unit’s management before procurement can take place. For the procurement of large-scale equipment, open tendering or invited tendering should be conducted. 2. Before signing the contract, the enterprise’s procurement department, safety management department, and finance department shall examine the qualifications of the manufacturer. Once those qualifications are verified, the procurement department is responsible for purchasing special equipment that meets the safety technical specifications, and such equipment shall be manufactured by a unit holding the appropriate manufacturing license. 3. Elevators that are suitable for the building structure and usage requirements, comply with relevant ** and provincial standards, and meet the needs related to emergency rescue, fire protection, barrier-free access, and traffic flow should be purchased. Passenger elevators in public buildings and residential buildings shall comply with the \"Requirements for the Selection and Configuration of Passenger Elevators in Public Buildings and Residential Buildings in Suzhou.\" 4. After the special equipment is purchased, the department responsible for its use organizes relevant technical personnel, the procurement department, and the safety management department to inspect and verify the equipment’s accompanying technical documents as well as its visual quality. If any problems are found, the manufacturing (sales) party should be contacted immediately for handling. After the equipment passes the acceptance inspection upon arrival, it should be promptly assigned a serial number and placed in a database for management; the technical documents and materials accompanying the equipment shall be stored in the safety and technical archives ; Equipment that fails the incoming inspection must not be allowed to be stored in inventory. II. Management System for the Installation, Modification, and Repair of Special Equipment (1) Installation of Special Equipment 1. A unit with the appropriate licensing for installing special equipment should be designated to carry out such installation work, and it is necessary to verify the qualifications of the workers involved in the construction. 2. Before commencing construction, the installation unit shall go through the procedures for notifying the special equipment safety supervision department as required. Special equipment shall not be installed without prior notification. For special equipment that does not require installation, the user entity shall itself submit a notification to the regulatory authority responsible for special equipment safety. 3. During the installation process, the entity using the special equipment shall ensure proper safety management at the installation site, check that the safety precautions put in place by the construction party are adequate, prevent unauthorized personnel from entering the site for work, and avoid situations where people work without the necessary qualifications. 4. The installation unit shall apply to the special equipment inspection agency for an installation supervision inspection. For special equipment that is subject to pre-commissioning inspection or initial inspection, the user entity shall apply to a special equipment inspection agency for such inspection. For mobile cranes that have been disassembled and then reinstalled, no further installation supervision inspection is required; regular inspections shall be carried out in accordance with the \"Safety Technical Regulations for Cranes\". 5. After installation is complete, the user unit conducts acceptance testing on the special equipment. Upon passing the acceptance inspection, the installation unit shall deliver the special equipment to the user unit and transfer the relevant technical documents and materials to the user unit within thirty days. The user entity shall file it in the safety technical archive of such special equipment. (II) Modification of special equipment: 1. Before modifying special equipment, thorough feasibility studies should be conducted, and the original design unit or a design unit with the appropriate qualifications should be commissioned to carry out the modification design. 2. The user entity shall designate a unit with the appropriate licensing qualifications to be responsible for the renovation work, and shall verify the qualifications of the personnel entering the site to carry out the work. 3. Before construction, it is necessary to complete the commencement notification procedures with the special equipment safety supervision department as required. Special equipment shall not be modified without prior notification. 4. During the renovation process, the special equipment unit shall ensure proper safety management at the renovation site, check that the safety precautions taken by the construction party are in place, prevent unauthorized personnel from entering the site for work, and avoid situations where workers operate without the necessary licenses. 5. The modifying unit shall apply to the special equipment inspection agency for a supervision inspection of the modification. The modified forklift undergoes its first inspection. 6. After the renovation is completed, the user unit conducts an acceptance inspection of the special equipment. Upon successful acceptance, the renovation unit shall deliver the special equipment to the user unit and transfer the relevant technical documents and materials to the user unit within thirty days. The user entity shall file it in the safety technical archive of such special equipment. 7. The modification of lifting machinery must also be carried out in accordance with the provisions of the \"Safety Technical Specifications for Lifting Machinery\" and its amendments. (III) Repair of special equipment: 1. Before repairing special equipment, thorough feasibility studies must be conducted, and a qualified design firm should be commissioned to carry out the repair design. 2. The user unit shall designate a qualified entity to carry out the repair work, and ensure that the qualifications of the personnel entering the site for construction are appropriate. 3. Before construction, it is necessary to complete the commencement notification procedures with the special equipment safety supervision department as required. Special equipment shall not be repaired without prior notification. . 4. During the repair process, the entity using the special equipment shall ensure proper on-site safety management, check that the safety precautions put in place by the construction party are adequate, prevent unauthorized personnel from entering the site for work, and avoid situations where workers operate without the necessary qualifications. 5. The repair unit shall apply to the special equipment inspection agency for supervision and inspection of major repairs. 6. After the repair is completed, the user unit conducts an acceptance inspection of the special equipment. Upon successful acceptance, the repair unit shall deliver the special equipment to the user unit and hand over the relevant technical documents and materials to the user unit within thirty days. The user entity shall file it in the safety technical archive of such special equipment.
Reply #22024-06-21
The management of special equipment includes aspects such as procurement, installation, modification, and repair, and certain systems are followed to ensure the quality and safety of the equipment. When purchasing special equipment, approval is required, the manufacturer’s qualifications must be verified, and it must be ensured that the equipment complies with safety technical specifications. When installing, modifying, or repairing special equipment, it is necessary to engage units with the appropriate qualifications to carry out the work, and the relevant procedures must be followed as required. At the same time, it is necessary to ensure site safety during construction, conduct inspections of the equipment upon completion, and properly archive relevant technical documents. The entire process emphasizes safety supervision and standardized operations to prevent risks. .

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.