Baike Energy has obtained a patent for a pipeline-integrated containerized storage tank that increases the capacity of storage tanks within standard containers

2025-08-13View Original

Thread Content

Baike Energy has obtained a patent for a pipe-integrated containerized storage tank that increases the capacity of tanks within standard containers. On August 8, 2025, according to information from the Intellectual Property Office, Tianjin Baike Energy Equipment Co., Ltd. was granted a patent titled “Pipe-Integrated Containerized Storage Tank.” The patent number is CN223204123U, and the application was filed in October 2024. The patent abstract indicates that this utility model discloses a pipeline-integrated container-type storage tank, which includes a main component. A pipeline assembly is arranged within the main component and is fixedly connected to it; a valve assembly is provided on the pipeline assembly and is also fixedly connected to the main component. A storage tank is located within an outer frame, with the storage tank being fixedly attached to this frame. A top plate is present on the upper side of the outer frame, and it is fixedly connected to the frame. Side plates are located on both sides of the outer frame, and they are fixedly connected to it as well. An airtight door is installed on one side of the outer frame; a door panel is attached to this airtight door and is fixedly connected to the outer frame. A heat exchanger is located on one side of the storage tank, and it is fixedly connected to the outer frame. Additionally, a buffer tank is present on the same side as the storage tank, and it is also fixedly connected to the outer frame. By placing the heat exchanger and the buffer tank at the corners of the outer frame and optimizing the piping layout, the capacity of the storage tank within the standard container can be increased.
Reply #22025-08-14
【History of Haichuan Chemical】The Birth of China’s First Large-Scale Modern Alcohol Plant https://bbs.hcbbs.com/thread-5697868-1-1.html (Source: Haichuan Chemical Forum)
Reply #32025-08-14
【Ten Years of Rapid Development in Chemical Processing Equipment】China Petrochemical’s first integrated process simulation software was successfully tested on Unit 3 of the Zhenhai Refining & Chemical Complex from 2009 to 2025. https://bbs.hcbbs.com/thread-5698666-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #42025-08-14
【Ten Years of Rapid Development in Chemical Equipment】High-quality completion of China National Petroleum Corporation’s first independently designed PO/SM unit as part of the Guangxi Petrochemical integration and transformation project, 2611–2025 https://bbs.hcbbs.com/thread-5698681-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #52025-08-14
【Ten Years of Rapid Development in Chemical Engineering Equipment】2612-2025: Tianjin Petrochemical’s independently developed pipeline wall-crawling robots solve the challenges associated with inspecting overhead pipelines https://bbs.hcbbs.com/thread-5698697-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #62025-08-16
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2016 to 2025, Tianhua Institute independently developed 8 heat box systems, which were successfully deployed in ExxonMobil’s 500,000 tons per year low-density polyethylene (LDPE) production facility. https://bbs.hcbbs.com/thread-5698775-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #72025-08-16
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2016 to 2025, Tianhua Institute independently developed 8 heat box systems, which were successfully deployed in ExxonMobil’s 500,000 tons per year low-density polyethylene (LDPE) production facility. https://bbs.hcbbs.com/thread-5698775-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #82025-08-16
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2017 to 2025: Overcoming key technical challenges; China’s first thousand-ton-class high-performance carbon fiber production line was built in Datong, Shanxi https://bbs.hcbbs.com/thread-5698780-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #92025-08-16
【Ten Years of Rapid Development in Chemical Processing Equipment】2618-2025: Closing Domestic Technology Gaps; First domestic development of TDI railway tank containers successful https://bbs.hcbbs.com/thread-5698801-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #102025-08-16
【Ten Years of Rapid Development in Chemical Engineering Equipment】Major breakthroughs achieved in low-concentration gas power generation at the Lujiayu Gas Power Plant owned by Jinneng Holding from 2019 to 2025 https://bbs.hcbbs.com/thread-5698816-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #112025-08-16
【History of Haichuan Chemical】Lanzhou Xigu Thermal Power Plant – The key contributor behind Lanzhou Refinery and Lanzhou Chemical Industry https://bbs.hcbbs.com/thread-5698829-1-1.html (Source: Haichuan Chemical Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.