HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Air-cooling delivery cycle

2018-10-01View Original

Thread Content

How long is the delivery time for ordinary air coolers?
Reply #22018-10-01
“The term “air cooler” is too general; it would be better to be more specific. Then discuss it.
Reply #32018-10-01
Dry air cooling; lead time for materials of ordinary quality is 3 months; Wet air cooling; delivery time for materials of ordinary quality is 5 months.
Reply #42018-10-02
Dry air cooling; The tube sheet and tube box are made of Q345(HIC), while the forgings are made of 16Mn(HIC)
Reply #52018-10-07
Dry air cooling; The supply period for tube boxes and tube sheets made of Q345(HIC), as well as forgings made of 16Mn(HIC), is highly dependent on the supply capabilities of the material suppliers; it can range from two months to six months ;
Reply #62018-11-09
Delivery time for this empty cooler is 120 days
Reply #72019-02-17
The lead time for deliveries from our company is generally three months

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.