Use a large tower on-site, with openings made at the bottom for modification

2020-11-14View Original

Thread Content

A filler tower with a diameter of DN5300 and a height of around 60 meters is currently in use; it is now necessary to add an opening with a diameter of DN2000 at an elevation of around 13 meters; There is no filler at the opening; how should design and construction be approached?
Reply #22020-11-16
The design unit only provided reinforcement for the openings, and the construction team dared not proceed with the work.
Reply #32020-11-17
The reinforcement for the opening must meet the required standards; such a large opening, relative to the diameter of the housing, falls into the category of large openings. It is best to use analysis software to simulate it.
Reply #42020-11-22
The tower I’m working on now is just like this one

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.