I would like to ask everyone about the appropriate timing for performing penetrant testing

2020-12-05View Original

Thread Content

I currently have a column made of S31603 material. Due to the nature of the medium used, after installing the packing and internal components, only pressure testing can be carried out. As a result, all welds of types ABCD need to undergo penetrant testing. I would like to ask everyone: should I conduct RT testing on each section of the column after it has passed the testing, and then proceed with PT testing on the longitudinal welds? Should we wait until all the equipment has undergone joint welding and all RT inspections are completed, before conducting PT inspections on all the welds?
Reply #22020-12-05
It is necessary to consider the continuous progress of construction, as well as how to handle any issues that arise and whether it is possible to proceed. For reference.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.