【Ten Years of Rapid Development in Chemical Processing Equipment】The 16,300-ton central platform CEPB module for the Caofeidian 6-4 oil field was manufactured between 2022 and 2025

2025-03-07View Original

Thread Content

Give praise and encouragement to the achievements made in China’s chemical engineering technology and equipment; your participation in discussions is the greatest encouragement. **********************【Ten Years of Great Development in Chemical Engineering Equipment】Regular updates and summaries are available – feel free to join the discussions: https://bbs.hcbbs.com/thread-3576046-1-1.html ***************** On the morning of January 5th, after 12 months of construction, the CEPB module of the Caofeidian 6-4 oil field’s central platform was completed at the Qingdao International High-End Equipment Manufacturing Base. It set sail for the Bohai Sea to undergo offshore installation work. This module is a central platform with an 8-leg, three-deck structure; it is 50.4 meters tall, equivalent to the height of an 18-story building, 73.7 meters long, and 73.1 meters wide. Its area is roughly equivalent to that of 13 standard basketball courts. Its floating weight is about 16,300 tons, which is equivalent to the total weight of 12,000 cars
Reply #22025-03-07
【Ten Years of Rapid Development in Chemical Processing Equipment】The World’s Largest Diesel Adsorption and Separation Units, 2023–2025 – China Communications Construction https://bbs.hcbbs.com/thread-5681371-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #32025-03-07
【Ten Years of Rapid Development in Chemical Engineering Equipment】Completion of the upper modules for super-large 400,000-ton “offshore oil and gas plants” from 2022 to 2025 https://bbs.hcbbs.com/thread-5681370-1-1.html (Source: Haichuan Chemical Engineering Forum)
Reply #42025-03-09
【Ten Years of Rapid Development in Chemical Engineering Equipment】2238-2025: The world’s first application of molten salt energy storage technology in oil field steam injection applications https://bbs.hcbbs.com/thread-5681448-1-1.html (Source: Haichuan Chemical Engineering Forum)
Reply #52025-03-10
【Ten Years of Rapid Development in Chemical Equipment】Pilot-scale calibration completed for the green synthesis process of MDI using the urea method without phosgene 2240-2025 https://bbs.hcbbs.com/thread-5681562-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #62025-03-11
【Ten Years of Rapid Development in Chemical Equipment】2242-2025: Wumine Salt Lake’s world’s first project for lithium extraction via brine adsorption enters trial operation https://bbs.hcbbs.com/thread-5681637-1-1.html (Source: Haichuan Chemical Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.