The jacket for Shell Nigeria’s HI project was loaded onto a ship and delivered at the Tianjin Intelligent Manufacturing Base terminal

2025-12-19View Original

Thread Content

On December 15, the jacket for Shell’s HI project in Nigeria was loaded onto a ship at the Tianjin Intelligent Manufacturing Base port, marking a key milestone in the project’s development and injecting strong momentum into enhancing energy cooperation between China and Nigeria. The HI project is a landmark initiative in which CNOOC Engineering collaborates with Shell as the EPC general contractor for the first time. It is located 50 kilometers off the coast in the southern Niger Delta, at a water depth of 100 meters. The main components of the project include an upper module with four decks and a four-leg jacket; the project utilizes a hybrid power supply system combining wind and solar energy. Once completed, it will transport 350 million cubic feet of natural gas per day to support the expansion of Nigeria’s NLNG Line 7, thereby increasing the country’s liquefied natural gas production capacity by 35% and reinforcing its status as Africa’s largest natural gas producer. The jacket for the HI project features a 4-leg, 4-pile design, with a total weight of around 1,700 tons – equivalent to the weight of more than 1,300 cars. Its overall height is 103 meters, exceeding that of 36-story buildings. The project employs horizontal construction methods to precisely control welding deformation and optimize the assembly process. Digital techniques such as 4D visualization are used to fully leverage the capabilities of the “smart factory” automation lines, thereby accumulating experience for future jacket projects. The project emphasizes strict quality control throughout the construction process, establishes a dynamic inspection system, implements a “30-minute rapid response” mechanism, and conducts thorough inspections at all stages. This ensures that quality issues can be identified on-site, reported immediately, and resolved promptly, achieving full-process control. The project’s quality and safety standards far exceed those of the industry. In addition, by referring to international standards and Shell’s own standards, as well as drawing on experiences from previous projects, the project developed a specialized welding material plan, successfully enabling the use of domestic welding materials in international projects and setting a precedent for such materials in global engineering. Currently, the upper module of the HI project is in the final stage of onshore completion and testing. The project team is committed to maintaining high construction quality to ensure timely and high-standard delivery of the project, thus laying a solid foundation for deepening their strategic partnership
Reply #22025-12-20
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2029 to 2025, Beijing Haideliz developed and delivered a 30-kilowatt methanol-hydrogen combined heat and power system on its own https://bbs.hcbbs.com/thread-5708466-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #32025-12-20
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and text; everyone is welcome to participate in the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #42025-12-21
【Ten Years of Rapid Development in Chemical Equipment】Breakthroughs from 2905 to 2025! SHIHE Electric’s 300MW-class large-scale air turbines ensure the operation of China’s salt-cave compressed air energy storage demonstration project https://bbs.hcbbs.com/thread-5708518-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #52025-12-21
【Ten Years of Rapid Development in Chemical Equipment】2907-2025: China’s First Civilian Liquid Hydrogen Plant Obtains Safety Production License https://bbs.hcbbs.com/thread-5708618-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #62025-12-21
【Ten Years of Rapid Development in Chemical Processing Equipment】The world’s largest 9600 Nm³/h multi-functional hydrogen production BOP system was successfully delivered https://bbs.hcbbs.com/thread-5708761-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #72025-12-22
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2009 to 2025, Ningmei Group made significant progress in the key technologies related to the extraction of rare gases such as krypton and xenon from ultra-large air separation units. https://bbs.hcbbs.com/thread-5708777-1-1.html (Source: Huchuan Chemical Industry Forum (HCBBS))
Reply #82025-12-22
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first domestic emergency drill on land for 1,500-meter-class ultra-deep-water submarine pipelines was successfully carried out from 2010 to 2025. https://bbs.hcbbs.com/thread-5708788-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.