Thread Content
Improving efficiency, reducing costs, and enhancing quality control – a summary post on the 【Haichuan Modular Installation Discussion】; everyone is welcome to join the discussion! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=1773168 ------------------------------------------------------------------------------------------------- Shandong Haomai Heavy Equipment Co., Ltd.’s H003 pipeline tunnel module project was shipped; recently, the general lifting equipment used for loading the modules of this project was in active use at the project site. With the smooth operation of the lifting equipment, a modular heavy-duty lifting frame lifts industrial modules weighing hundreds of tons, accurately carrying out the entire process of relocation and placement. To meet the requirements of lifting modular equipment in the project, which comes in 8 different specifications with weights ranging from 35 tons to 135 tons, the 135-ton modular lifting system developed by Juli Ropes offers a highly efficient and reliable solution for heavy modular loading operations at ports, thanks to its flexibility, safety, and reliability.
【Ten Years of Rapid Development in Chemical Equipment】China National Petroleum’s first project of this kind – the Daqing Petrochemical 50,000 tons/year 1-hexene/1-octene co-production facility – has been successfully completed. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5723648 (Source: Haichuan Chemical Forum (HCBBS))
【Common Issues in Haichuan Pipeline Design】In-depth Analysis of the Design Requirements in TSG 31-2025 \"Technical Regulations for the Safety of Industrial Pipelines\" https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5725227 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))