HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Product test specimens

2021-08-10View Original

Thread Content

What should be done if the test specimens fail the inspection after being heat-treated in the same furnace?
Reply #22021-08-26
Equipment that fails the test twice is scrapped
Reply #32021-08-28
My intention was to ask what should be done with the equipment when the test samples fail; your answer was helpful to me. Thank you.
Reply #42021-09-02
If the retest is also unsuccessful, then the container must undergo heat treatment again; this situation is extremely rare, and it’s possible that the equipment should be scrapped :(
Reply #52021-09-04
Inspect the material, perform high-magnification metallographic analysis to identify the issues, and redo it twice; if it still fails, then there’s nothing more that can be done

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.