What aspects should be addressed in the anti-corrosion coating application for oil storage tanks?

2024-03-26View Original

Thread Content

Several points should be observed in the application of anti-corrosion coatings to oil storage tanks. 1. Surface treatment: Before applying the primer, the surface of the steel structure of newly built storage tanks should be treated by sandblasting to meet the Swedish standard SIS055900 Sa2.5 level; in areas where sandblasting is not feasible, rust removal should be carried out using power tools to achieve the SIS055900 St3 level. Use compressed air to blow away dust and sand particles, and use a solvent to remove oil stains. The surface must be free of slag, flux, and arc dust; the edges must be free of burrs and residual rust. Irregularities on the surface or other surface defects caused by sandblasting must be smoothed and filled in, or otherwise properly treated. Apply the primer within 6 hours after surface treatment. 2. Painting environmental conditions: It is advisable to paint when the weather is favorable; painting should not be done on wet surfaces. Work should not be carried out during rainy, foggy, snowy, or haily weather. The optimal temperature for painting is 5–35°C, with a relative air humidity of no more than 80%. Painting facilities should adopt appropriate shielding measures to prevent dust and rain from falling on undry paint surfaces. 3. Requirements for the painting process: Two-component coatings must be prepared in accordance with the specified ratios and thoroughly mixed evenly; the viscosity suitable for application should be adjusted using specialized diluents, depending on the specific application method. The mixing ratio of two-component coatings should be determined based on the required amount and the construction capacity during the usage period; it must be used up within that period, as it cannot be used after it has expired. If one batch of materials is not used up, the Component A must be thoroughly mixed evenly first; thereafter, Component A and Component B should be weighed in proportion and then mixed together thoroughly. Appropriate application methods are selected based on the construction conditions and area, as well as the application properties of the paint: Brush application: Applying it with a paint brush. When brushing on, it is advisable to alternate vertical and horizontal strokes. Pre-coating should be applied first to welds, rivet heads, and edges. Roll coating method: The roller should be dipped in the paint evenly. When applying paint, move the roller slowly up, down, left, and right to prevent the paint from spilling over the edges of the roller. Pre-coating should be applied first to welds, rivet heads, and edges. Air spraying method: During spraying, the spray gun should be at the correct angle and distance (30-50 cm) from the surface to be coated. When moving the spray gun up, down, left, and right, the distance between the spray nozzle and the surface to be coated should remain constant; it should not be moved in an arc-shaped path. Pre-coating should be applied first to welds, rivet heads, and edges. Airless spraying method: This method is recommended for large-scale applications. Pre-coating should be applied first to welds, rivet heads, and edges. During coating, the wet film thickness can be measured at any time, and the dry film thickness can be calculated; by adjusting the application method, the dry film thickness can be controlled to meet the specified requirements. During painting, the specified application intervals must be followed. If painting is carried out after exceeding the maximum repainting interval, to ensure interlayer adhesion, it is advisable to roughen the surface before applying the paint. The coating can be put into use only after it has fully cured. 4. Construction safety: Flammable materials (except paint) are strictly prohibited from being stored at the construction site; smoking is also forbidden on site. Welding or any work involving open flames is not allowed within 10 meters of the site. The storage area for coatings and the construction site must be equipped with necessary fire-fighting facilities. Explosion-proof lighting equipment should be used during construction. Ventilation facilities should be installed at the construction site, and the concentration of harmful gases must not exceed the specified limits. Workers carrying out the work should wear the necessary protective equipment. When working inside containers, they should take turns and adequate ventilation facilities should be in place. When working at heights, anti-slip measures must be in place, and workers should wear safety belts. When using a high-pressure air-free spray gun, it should be grounded to prevent static sparks from causing fires or explosions. Operate airless spraying equipment at extremely high pressures; never point the nozzle orifice at human bodies or palms to avoid causing injury. The waste solvents in cleaning tools and containers must not be discarded carelessly; they should be disposed of properly.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.