HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

PROCESS UTILITY MANAGER in HYSYS

2017-02-23View Original

Thread Content

As the title suggests, how is the PROCESS UTILITY MANAGER set up in HYSYS, where is it applied, and does it refer to what is commonly known as utility systems?
Reply #22017-02-23
It refers to the commonly mentioned utility systems, and the method used in Aspen is similar
Reply #32017-02-24
Mm-hm. There are many parameters that need to be set, including temperature settings, but no pressure setting. There are also various other parameters such as HTC, cost index, density, viscosity, thermal conductivity, etc. I’m not sure how to configure everything properly; for example, if I want to generate 0.4 MPag of saturated steam, how should I do that? Please provide detailed steps. In the energy flow, isn’t it possible to set the UTILITY TYPE? By specifying the type of utility, the amount of that utility can be calculated directly based on the thermal load of the energy flow, such as the amount of 0.4 MPag saturated steam generated.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.