HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How to discharge and replace gas in the low-pressure system of urea production using the CO2 stripping method?

2018-07-13View Original

Thread Content

How should tower sealing shutdown and tower draining shutdown be carried out?
Reply #22018-07-14
Low-pressure systems have buffer tanks for discharge; they are replaced only during maintenance. It’s not clear what exactly the original poster wants to ask
Reply #32018-07-15
Is it to directly discharge the low methane refrigerant level into the ammonia tank, and use the return fluid to circulate from the low methane refrigeration system back to the ammonia tank?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.