Thread Content
Environmental Impact Assessment Announcement for the Energy-Saving Technology Upgrade Project of Chongqing Xiangyu Salt Chemical Company’s Gasification Facility. Author/Source: Yahuac Coal Chemical Industry. Date: 2019-09-27. Clicks: 39. The project involves an investment of 1,500 million yuan to upgrade the existing gasification facilities in the open area to the south of the current factory site. An additional 122,000 m2 of land will be acquired, while 15,030 m2 of existing space within the factory site will be utilized, with 54,820 m2 allocated for buildings and structures; An additional area will be created on the south side of the existing plant, where new units for coal grinding and slurry preparation, gasification, shift reaction, low-temperature methanol washing, liquid nitrogen washing, ammonia synthesis, and sulfur recovery will be built. An air separation unit will be installed using the existing plant facilities, and as a result of these upgrades, the total annual production capacity of synthetic ammonia will increase from 200,000 tons to 300,000 tons per year. The second public notice regarding the environmental impact assessment for the energy-saving technology upgrade project for coal gasification at Chongqing Xiangyu Salt Chemical Co., Ltd. is hereby issued. In accordance with relevant regulations such as the Environmental Impact Assessment Law of the People’s Republic of China and the Measures for Public Participation in Environmental Impact Assessment, this second public notice is made regarding public participation in the environmental impact assessment of said project. 1. Basic project information Project name: Gasification energy-saving technology upgrading and renovation project ; Construction unit: Chongqing Xiangyu Salt Chemical Co., Ltd ; Construction site: Plot B10-05/04, Longbao Tuituan IV Management Unit, Yanchi Chemical Industry Park, Wanzhou, Chongqing (the open area to the south of the existing factory premises of Chongqing Xiangyu Salt Chemical Co., Ltd.) ; Construction nature: Renovation and expansion ; Construction scale: An investment of 1,500 million yuan is planned to upgrade the existing gasification facilities on the vacant land to the south of the current factory site. A new area of 122,000 m2 will be acquired, while 15,030 m2 of the existing vacant land within the factory site will be utilized, with 54,820 m2 allocated for buildings and structures ; An additional area will be created on the south side of the existing plant, where new units for coal grinding and slurry preparation, gasification, shift reaction, low-temperature methanol washing, liquid nitrogen washing, ammonia synthesis, and sulfur recovery will be built. An air separation unit will be installed using the existing plant facilities, and as a result of these upgrades, the total annual production capacity of synthetic ammonia will increase from 200,000 tons to 300,000 tons per year. 2. Key points of the environmental impact assessment conclusions outlined in the environmental impact report: The production processes and equipment selected for the proposed project are mature, advanced, and reliable; the project is located in plot B10-05/04 of the Longbao Tuantuan IV management unit within the Chongqing Wanzhou Salt-Gas Chemical Industrial Park, making the site selection appropriate. The project meets the requirements for clean production and compliant emissions, and the total amount of pollutant emissions is in line with environmental management standards. The environmental quality in the area where the proposed project will be located is good, and the overall pollutant emissions from the project will have a minimal impact on the environment. The project offers significant environmental and economic benefits; the proposed environmental measures are effective and feasible, the measures for preventing environmental risks are comprehensive, the environmental monitoring plan has the necessary conditions for implementation, and the environmental protection completion inspection can be carried out in accordance with the \"three simultaneities\" requirements. From the perspective of environmental protection, the site selection for the proposed project is reasonable and the construction plan is feasible. (2) Constructor and contact information: Constructor: Chongqing Xiangyu Salt Chemical Co., Ltd. (former name: Chongqing Yihua Chemical Co., Ltd.) Contact address: Chongqing Xiangyu Salt Chemical Co., Ltd., Yanchi Chemical Industry Park, Wanzhou, Chongqing