Thread Content
Improvement of the desulfurization system in the purification workshop of Jinfeng Xifenghang / Author/Source: Jinfeng Xifenghang / Date: 2021-11-12 / Clicks: 23. To ensure the safe and stable operation of the production facilities over extended periods, the purification workshop recently organized a special seminar with relevant technical personnel to discuss the issue of unstable pressure differences in the desulfurization tower of System 1. It is understood that the workshop requires operators in relevant fields to make appropriate adjustments to the flow meter at the outlet of the desulfurization pump, to continuously monitor changes in the pressure difference within the desulfurization tower, and to adjust the circulation rate accordingly based on those changes, so as to keep the pressure difference within the specified technical parameters. Enhance personnel coordination; those working in different stages of the process should maintain close communication during adjustments, in order to maintain the proper liquid level in the desulfurization tower and prevent fluctuations in the system caused by liquid carryover or air leakage. The responsibilities of process technicians should be clarified; the suction volume of injectors must be monitored continuously. Injectors with a suction volume of less than 7.5 should be cleaned promptly or maintenance personnel should be contacted for cleaning, in order to ensure effective regeneration… The person in charge of this workshop said that during this critical period of \"ensuring one thing and welcoming two events,\" the workshop needs to strengthen shift coverage, carry out regular training sessions, improve employees’ professional skills and operational capabilities, and thus reinforce safety measures.
What causes unstable pressure differences in the desulfurization tower?