HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Orchid Innovation uses pure oxygen continuous gasification furnaces to carry out environmentally friendly and energy-saving upgrades of existing fixed-bed batch gasification furnaces

2023-10-05View Original

Thread Content

https://p3-sign.toutiaoimg.com/tos-cn-i-6w9my0ksvp/76767751361849c48c3168ce2a05184b~tplv-tt-origin-asy2:5aS05p2hQOS4remYgOS8gemjjumHhw==.image?_iz=58558&from=article.pc_detail&x-expires=1697081604&x-signature=ndzeFtmqvzli765m%2BSgKCBSjc4U%3D Recently, the Tianyue Fertilizer Branch of Shanxi Broccoli Technology Entrepreneurship Co., Ltd. held a ceremony to mark the start of a new project. The environmental protection and energy-saving upgrade project for the company’s gasification and ammonia synthesis plants has officially commenced, entering a full-scale construction phase. In accordance with the relevant industry and environmental protection policies at the national, provincial, and municipal levels, all fixed-bed batch gasifiers must be phased out by the end of September 2024. Tianyue Company’s current gasification facilities utilize 16 cone-jacketed fixed-bed batch gasifiers with a diameter of 2.8 meters, which do not meet the requirements stipulated in the relevant policy documents. As required by Orchid Innovation Co., Ltd., the company has upgraded its existing fixed-bed batch gasification furnaces to environmentally friendly and energy-efficient models using pure oxygen continuous gasification furnaces, while also making corresponding modifications to the related processes. The total estimated investment for this project is 222 million yuan (of which 95.33 million yuan is allocated to the air separation unit). It fully meets the requirements set by Shanxi Province for technical upgrades, which stipulate that there should be no increase in production capacity, no increase in pollutant emissions, and no increase in energy consumption. Therefore, it constitutes an environmental protection and energy-saving renovation project. The project involves the construction of 10 new pure oxygen continuous gasification units with a diameter of 3.2 meters, the installation of a new air separation unit, the addition of a pre-desulfurization system to the semi-desulfurization process, the replacement of electrostatic precipitators, and various other upgrades and modifications; completion is expected by the end of September 2024.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.