The full process of the 45,000 m3/h syngas technical upgrade project at Lu’an Chemical Qilu Yihua Company has been completed

2025-12-25View Original

Thread Content

On December 23, 2025, the entire process of the 45,000 m3/h syngas technology upgrade project at Qilu No.1 Chemical Company of Lu’an Chemical was completed, resulting in the successful production of octanol. At 8 a.m. on December 24, after multiple rounds of rigorous testing, the purity of the octanol product reached 99.63%, with its key parameters meeting the standards for Type I products; this marked the official entry of the project into a new phase of operation. The commissioning milestones for the syngas technical upgrade project are as follows: on November 28, the boiler will start producing steam. On December 15, the air separation unit supplied oxygen to the gasification unit. On December 16, the first ignition of the gasifier during its heating-up was successful. On December 20, the gasifier achieved successful first-time feeding and produced qualified syngas. On December 23, the butyl acetate plant produced octanol products, achieving the production target one week ahead of schedule. The technical renovation project for Qilu Yihua’s 45,000 standard cubic meters per hour syngas plant is the key project for the company to achieve the upgrading and development of its facilities. The project utilizes domestically leading process technologies to comprehensively upgrade the existing facilities; the synthetic gas upgrade at Qilu First Chemical Plant employs Jinhua furnaces (two Jinhua furnaces, one in operation and one as a backup). Replacing the fixed-bed batch gas production process, and integrating CO shift, low-temperature methanol washing, PSA hydrogen production, and sulfur recovery, to achieve an effective synthesis gas production capacity of 45,000 m3/h. Huisheng Engineering EPC. The Syngas Technical Renovation Project of Qilu No.1 Chemical comprises three parts: syngas technical renovation, safety and environmental protection upgrades for butanol and octanol production, and renovation of the dedicated railway line. After the project was put into operation, the energy consumption associated with the production of octanol decreased, while emissions of sulfur dioxide, nitrogen oxides, and chemical oxygen demand were significantly reduced, resulting in substantial improvements in environmental performance.
Reply #22025-12-25
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first domestic emergency drill on land for 1,500-meter-class ultra-deep-water submarine pipelines was successfully carried out from 2910 to 2025. https://bbs.hcbbs.com/thread-5708788-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #32025-12-25
【Ten Years of Rapid Development in Chemical Equipment】Breakthroughs from 2905 to 2025! SHanghai Electric’s 300MW-class large-scale air turbines ensure the operation of China’s salt-cave compressed air energy storage demonstration project https://bbs.hcbbs.com/thread-5708518-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #42025-12-26
【Ten Years of Rapid Development in Chemical Engineering Equipment】Full capacity commissioning of China’s most remote offshore wind power projects by 2025 https://bbs.hcbbs.com/thread-5708401-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #52025-12-26
【Ten Years of Rapid Development in Chemical Equipment】The first electrocracking furnace in China was successfully put into operation at Dushanzi Petrochemical Company between 2016 and 2025. https://bbs.hcbbs.com/thread-5709248-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #62025-12-26
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2018 to 2025, Shandong Zhanggu successfully developed its first domestically produced TEP steam compressor, which was then shipped out. https://bbs.hcbbs.com/thread-5709282-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #72025-12-27
【Haichuan Equipment Guessing Game】Does anyone know it? ? What kind of storage tank is this? Why does it have such a structure inside? https://bbs.hcbbs.com/thread-5709647-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #82025-12-27
【Ten Years of Rapid Development in Chemical Equipment】Major breakthroughs from 2024 to 2025! ! Two breakthroughs in domestic high-end electric drives: ultra-high-speed motors capable of operating at 10,000 revolutions per minute and motors with a vacuum distribution capacity of 100,000 have passed the evaluation tests. https://bbs.hcbbs.com/thread-5709405-1-1.html (Source: Haimen Chemical Industry Forum (HCBBS))
Reply #92025-12-28
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2027 to 2025, Yanshan Petrochemical’s 1.2 million tons per year gasoline adsorption desulfurization unit became the first of its kind in China to receive carbon neutrality certification. https://bbs.hcbbs.com/thread-5709493-1-1.html (Source: HCBBS Chemical Forum)
Reply #102025-12-28
【Ten Years of Rapid Development in Chemical Equipment】First of its kind in China from 2928 to 2025! Pilot production of Ordos’ “sand thermal battery” a success! https://bbs.hcbbs.com/thread-5709536-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #112025-12-28
【Ten Years of Rapid Development in Chemical Engineering Equipment】China’s first large-scale perovskite building-integrated photovoltaic demonstration project was officially connected to the power grid from 2029 to 2025. https://bbs.hcbbs.com/thread-5709550-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.