Fill-in-the-blank: Before starting a centrifugal pump, it must be primed; otherwise, ( ) will occur; The installation height of the centrifugal pump should be less than (greater than, less than, equal to) the allowable installation height; otherwise, ( ) will occur. Answer: Gas entrapment, cavitation. Hint: An additional reward will be given to those who can explain the problem-solving process; the answer can be found in the response!
Reply #22019-11-19
Air entrapment and cavitation: If the pump is not filled with fluid before starting, non-condensable gases (such as air) remain inside the pump, which can lead to air entrapment during operation; If the installation height is higher than the allowable level, cavitation is likely to occur even if the pump is primed before startup, as the liquid being transported vaporizes.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.