General requirements for the numbering and labeling rules of pipelines

2021-10-09View Original

Thread Content

I. The pipes on the P&ID are numbered based on the process step (main item) and the medium. For pipes of each medium type, within each process step, numbering starts at 01 (or 001), with numbers increasing in sequence according to the order of the pipes in that step. II. The number of pipeline numbers assigned should be as low as possible, provided that the requirements for design, ordering, construction, operation, accident handling, and maintenance are met without causing confusion or errors. III. The pipeline numbering method used for various processes within a single unit should be the same; different units (or those designed by different agencies) may employ different pipeline numbering methods. IV. After the pipelines are numbered, as the engineering design progresses, if some pipelines need to be removed, their original numbers are usually no longer used; these removed numbers are not applied to the newly added pipelines.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.